Skip to content

Romco Demolition · St. Lucie County

St. Lucie County demolition, quoted after the paperwork is mapped

Port St. Lucie wants utility letters, Fort Pierce wants a debris affidavit, and the state wants an asbestos notice for every demolition, asbestos or not. Romco Builders works out which of those your property needs, then quotes the job. Any type, any size.

  • A licensed Florida general contractor
  • We quote demolition of every kind and size
  • Romco applies for the permit as contractor of record
  • Asbestos survey and abatement by licensed firms we coordinate
An orange excavator sitting on a pile of broken concrete beside a metal-clad warehouse.

What decides the job

The teardown is rarely what holds things up

Across St. Lucie, delays tend to come from three places: the wrong permit office, a missing utility letter, and a state notice period that cannot be shortened.

Three cities and a county

Port St. Lucie, Fort Pierce and St. Lucie Village each issue their own permits. Everything outside them, from Lakewood Park to the south end of Hutchinson Island, goes to the county.

A state notice on every demolition

The Florida Department of Environmental Protection wants its demolition notice filed ten working days out on every job, clean building or not. Booking the licensed survey early keeps that notice accurate.

Septic tanks and service lines

Thousands of Port St. Lucie homes still run on septic. Abandonment follows the state onsite sewage rule, and the utility letters have to be in hand before the city releases the permit.

Ground below the water line

Lots along the North Fork and the Indian River Lagoon sit close to the water. When removing a pool shell or footings opens a hole below groundwater, Romco does its own dewatering and Support of Excavation.

Jobs we quote

Demolition we quote, including

One room in a Hutchinson Island condo, a tornado-damaged mobile home, a 1960s block house in Port St. Lucie. If yours is not here, call and describe it.

Start to finish

How a St. Lucie job moves

  1. Reach out

    Phone us or use the form. Include the address, what is coming down, what is staying, and photos or plans if you have them.

  2. We look at the property

    We check the structure, where power, water and sewer or septic connect, how equipment and trucks reach the work, and what is next door.

  3. A written scope and quote

    It lists what is removed, what is protected and what is hauled, and flags anything that depends on the asbestos survey.

  4. Survey, notice, letters, permit

    A licensed asbestos survey, the state demolition notice, the utility letters, then the permit from the city, town or county.

  5. Demolition and hauling

    Work follows the agreed order. Debris goes to permitted facilities, and the tickets are kept.

  6. Final inspection

    The inspector closes the permit. You get a cleared lot, or the shell you asked us to leave.

Questions

What owners usually ask

What will my demolition cost in St. Lucie?

We put a number on it once we have seen the job, on site or through photos and plans that show enough. It turns on what the structure is built from, its footprint and height, what the asbestos survey finds, which services need disconnecting, whether a septic tank must be abandoned, how equipment gets in, what sits next door, what you want kept, and the haul to the disposal site. Two houses on the same Port St. Lucie street can quote quite differently, so we do not post rates.

Is any job too small or too large in size for you?

No. We quote a single shed, a screen enclosure, a pool, a mobile home or a full commercial building, and partial jobs where most of the structure stays. Tell us what is on the property and what must remain, and the quote follows that.

Who issues a demolition permit in St. Lucie?

That depends on the parcel. Port St. Lucie, Fort Pierce and St. Lucie Village each run their own permitting, and the county's Building and Code Regulations Division handles all unincorporated land. The county's building guidance applies permits to the removal and demolition of every building or structure. When you hire Romco, we file as contractor of record and schedule inspections through the final. Check the current requirements with the office for your parcel.

Do I need an asbestos survey if I think there is no asbestos?

The state's position is that every demolition needs a written notice, even when no asbestos is found, and the notice has to be filed at least ten working days before demolition begins. St. Lucie notices go to the Florida Department of Environmental Protection's Southeast District. A building permit does not take its place. Fort Pierce also asks for an asbestos report on older homes and commercial buildings. Romco books a licensed survey and brings in a licensed abatement firm for any material found, since we hold no abatement license ourselves.

How long does the whole process take?

We do not estimate it before the facts are in. It depends on review time at your city, town or the county, how quickly the utility letters arrive, the survey result and the state notice period, any historic board review in Fort Pierce, septic abandonment, and the size and construction of the structure. When those answers are in, you get a step-by-step sequence with the holdups for each step spelled out.

Is Romco Builders licensed?

Yes. Romco Builders is a licensed Florida general contractor with its office in Fort Lauderdale. Work that requires its own license, including asbestos abatement, electrical and plumbing disconnects, septic abandonment, mold remediation and tree removal, goes to firms holding that license, and we keep them on one schedule.

What utility paperwork does a demolition need here?

It varies by office. Port St. Lucie's checklist asks for a letter from FPL and one from the city's Utilities Department confirming service has been removed. Fort Pierce wants pre-approval from the Fort Pierce Utilities Authority or FPL before a full demolition. Septic tanks are abandoned under the state onsite sewage rule, Rule 62-6.011. Romco chases each letter and files only when nothing is missing.

Where does demolition debris end up?

At permitted disposal and recycling sites. In St. Lucie County that includes the county's Baling and Recycling Facility on Glades Cut-Off Road, which takes construction and demolition debris. Fort Pierce asks for a debris affidavit with the permit. Asbestos waste, if any, leaves separately with the abatement firm. Hauling and disposal show as their own line on the quote.

Do you cover all of St. Lucie County?

Yes: Port St. Lucie, Fort Pierce, St. Lucie Village and every unincorporated area, including Lakewood Park, River Park, White City and the St. Lucie end of Hutchinson Island. We are based in Fort Lauderdale and work to the rules of whichever office has jurisdiction.

Can one part of a building come down while the rest stays occupied?

Usually, if the sequence is planned first. That means shoring designed by an engineer where structure is removed, barriers that keep dust and debris away from occupied rooms, and work hours agreed with the owner or the condominium association. In an older building, the asbestos survey result often decides the order of the work.

Request a quote

Give us the address and the scope

Photos or plans help. So does a quick phone call. (772) 310-3298.

We need a phone number or an email, not both.

Photos (up to 5, optional)

One shot from the road and close-ups of anything that concerns you. Plans can follow by email.

Best way to reach you
News and offers (optional)

We will contact you about this quote the way you chose above, whether or not you tick the boxes below.

We use your details only to scope the job, quote it and reply.

Every type and size, all over St. Lucie County

Tell us what has to come down, and we will quote it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One wall inside a house or an entire building gets the same thing from us: a written scope and a number.

Call (772) 310-3298Request a quote